AFS Air-Flow Systems - Engineered Airflow for a cleaner tomorrow
AFS Air-Flow Systems

Engineered Airflow for a cleaner tomorrow

Commercial kitchen with extraction canopy and cooking equipment, from the supplied canopy brochure

Air-Flow Systems

Cape Town & Western Cape

Commercial kitchen extraction & ventilation in Cape Town.

Design support, supply and installation of canopies, ducting, fans, filtration and make-up air.

Photo from the supplied canopy brochure

Services

Restaurant ventilation and kitchen extraction.

For restaurants, hospitality and commercial kitchens across Cape Town and the Western Cape.

Explore all six services and useful project details
01

Commercial kitchen extraction & ventilation

Kitchen extraction canopies, hoods, grease filters, ducting, extractor fans and discharge. Make-up air, also called replacement air, replaces the air extracted from the kitchen.

Useful first detailsCooking equipment, fuel type, kitchen layout and the possible duct route. For an existing system, describe the symptoms and what has changed.

Start project enquiry
02

Kitchen smoke, filtration & odour control

UV and carbon treatment for grease, smoke and odour concerns, selected for the cooking equipment and discharge route.

Useful first detailsCooking equipment and fuel type, grease, smoke or odour concerns, surrounding occupancies, available space and maintenance access.

Start project enquiry
03

Kitchen fire suppression

Fire protection coordinated with the appliances, canopy and extract duct.

Useful first detailsAppliance layout, existing protection and project approval requirements.

Start project enquiry
04

Kitchen ventilation design & drawings

Ventilation layouts and mechanical CAD drawings for coordination and submissions. Required engineering sign-off is provided by a competent engineer.

Useful first detailsArchitectural drawings, appliance schedule and municipal submission context.

Start project enquiry
05

Cold & freezer rooms

Cold storage for hospitality and food-service projects.

Useful first detailsRoom dimensions, target temperature, stored products, access and expected use.

Start project enquiry
06

Air-conditioning & refrigeration

Air-conditioning and refrigeration for the kitchen and related spaces.

Useful first detailsSpace, heat load, equipment requirements and existing services.

Start project enquiry

Kitchen airflow

Follow the complete air path.

Select a stage to see its role.

Conceptual commercial kitchen ventilation systemA conceptual diagram showing canopy capture, grease separation, duct and fan, make-up air, optional treatment and discharge. It is not an engineering drawing.0102030405WHERE APPROPRIATE06CONCEPTUAL SYSTEM VISUAL · NOT AN ENGINEERING DRAWING

Conceptual system visual - not an engineering drawing.

Capture

Contain the cooking plume

The canopy geometry and its position need to suit the appliance line, heat and vapour released by the cooking process.

View service details

System examples

Canopies, filtration and discharge.

Photos from the supplied product brochures.

Kitchen canopy from the supplied ENVIRO recirculating filtration brochureView photograph
Recirculating canopyConfirm the cooking duty, fuel limits and fresh-air requirements.
Stainless-steel extraction canopy from the supplied EMEX UV brochureView photograph
UV canopyPlan access for cleaning and maintenance.
Commercial kitchen cooking line and extraction canopies from the supplied canopy brochureView photograph
Cooking lineMatch the canopy to the cooking-equipment layout.
Two workers fitting rooftop extraction equipment, from the supplied VENTPRO brochureView photograph
Rooftop dischargeConsider the duct route and service access.

Recirculating canopy

Kitchen canopy from the supplied ENVIRO recirculating filtration brochure

Confirm the cooking duty, fuel limits and fresh-air requirements.

Supplied product-brochure photograph, not verified AFS project work. Shown at up to its original resolution.

1 of 4

Process & design

From brief to installation.

Plan the airflow, drawings and approval requirements before installation.

01

Share the project brief

Share the cooking-equipment list, fuel type, layout, location and known constraints.

02

Assess the air path

Consider capture, make-up air, duct route, fan, treatment and discharge.

03

Define the scope

Agree equipment, drawings and the quotation.

04

Supply and install

Plan supply and installation around site access and approvals.

Mechanical CAD drawings support coordination and submissions. Required engineering sign-off must come from a competent engineer.

Start project enquiry

Systems & filtration

Kitchen smoke and odour filtration.

Compare extraction, UV treatment, carbon filtration and fire protection for your cooking equipment and site. Grease, smoke and odour need to be considered separately when selecting treatment and a discharge route.

Read the filtration guide
EMEXUV treatmentVENTPROExtraction systemsENVIROCarbon filtrationFire suppressionKitchen protection

EMEX UV treatment

UV treatment is selected for the cooking duty, grease filtration and airflow. Specialist installation and servicing must follow the manufacturer’s instructions.

Read the EMEX UV treatment guide

ENVIRO filtration

ENVIRO offers recirculation and low-level discharge configurations. The supplied literature limits recirculation to light cooking without gas-fired equipment. Fresh air, heat load and approval requirements must be checked for the selected model.

Read the ENVIRO filtration guide

Kitchen fire suppression

Specialist fire protection covers the cooking appliances, canopy, plenum and duct. The ANSUL guide outlines the equipment and design considerations.

Read the Kitchen fire suppression guide

Owner-led service

About Air-Flow Systems.

David Thomas leads Air-Flow Systems, supplying and installing commercial kitchen extraction, ventilation and related systems across Cape Town and the Western Cape.

We work with restaurant operators, contractors and project teams on new kitchens, refurbishments and extraction upgrades. Cooking equipment, replacement air and the duct route are considered together before the scope is agreed.

Your project brief

Prepare a project brief.

Select the available details and transfer the summary to the enquiry form.

Interactive checklist

Select your project details.

Select what you know. Other details can be confirmed later.

0%

Checklist sections covered.

01Project context

What kind of work is being planned?

02Cooking duty

Information that helps define the load.

03Kitchen information

Plans and dimensions can follow after contact.

04Air path and discharge

Note what is known; a complete design is not expected.

05Special requirements

Flag these early if they may affect the system.

06Site and programme

Enough context to plan the next conversation.

0 of 6 information groups covered · 0 details selected
Continue to enquiry

Nothing is sent until you submit the enquiry form. Continue transfers your selections to the enquiry form. When browser storage is available, a copy is kept in this tab for up to 30 minutes and removed when transferred. No contact details are stored by this checklist.

Project guidance

Equipment guides.

Read the equipment summaries below. Installation and servicing require the current manufacturer instructions.

Company overview

Who we are, the services available and how to start a project.

Commercial kitchen ventilation

Air-Flow Systems helps commercial kitchen projects in Cape Town and the Western Cape bring extraction, filtration and related services together.

We assess the cooking equipment, canopy, duct route and discharge together.

Services to discuss

Kitchen extraction canopies; EMEX and VENTPRO ventilation products; UV and carbon filtration; ENVIRO options; fire-suppression coordination; cold and freezer rooms; and air-conditioning. Availability and the final scope are confirmed for each project.

Design and project coordination

Share the kitchen layout, site constraints and drawing requirements. A competent professional must provide any required engineered design or sign-off.

Start with a useful brief

Tell us your suburb, business type, whether this is a new or existing kitchen, the cooking equipment and fuel type, and the problem or outcome you want to address. Plans, dimensions and clear site photographs help shape the next discussion.

Reference: Air-Flow Systems company introduction.

Canopy extraction

Canopy types, system coordination and information needed for selection.

Capture starts with the kitchen

A canopy is one part of a complete extraction system. Its arrangement needs to suit the cooking line, the room and the route out of the building.

Choose the right arrangement

The supplied range includes wall-mounted and island canopies, display canopies, steam or dishwasher canopies, supply-air / return-jet options and low-level arrangements. These are different applications, not interchangeable selections.

Consider more than the canopy

Review the cooking equipment, canopy position, grease separation, duct route, fan, replacement air, discharge location and access for cleaning. Noise and neighbouring spaces also need to be considered at the design stage.

Specify the actual installation

Dimensions, stainless-steel specification, lighting, filters and other accessories are confirmed for the selected model and site. Drawings and a project quotation should define what is included before work proceeds.

Prepare for the discussion

Provide a plan or sketch, equipment dimensions and fuel types, ceiling information, possible duct routes and photographs of the cooking line and building exterior. Identify any existing extraction or ventilation concerns.

Reference: Air-Flow Systems Canopy Extraction Hoods, pp. 2-6.

ENVIRO filtration

Recirculation and low-level discharge, with the important application limits.

Recirculation and external discharge

ENVIRO reference material describes recirculation and low-level external discharge as separate configurations. The distinction matters before a system is selected.

Recirculation: a restricted application

The supplied document limits recirculating units to light cooking without gas-fired equipment. It also requires adequate fresh-air provision and consideration of the cooking heat load. Filtration does not remove the need to assess the room environment.

Low-level discharge: a different route

Low-level discharge sends treated air outside. The supplied brochure allows gas-fired equipment in this configuration, excluding open-flame grilling. Review the outlet, cooking process, fuel, neighbouring spaces and site conditions separately from recirculation.

A sequence of treatment stages

The system combines grease separation, particle filtration, carbon odour filtration and a fan. Capacity and filter replacement requirements depend on the selected unit.

What we need to assess

Share the equipment and fuel list, cooking intensity, available floor or ceiling space, fresh-air provision, possible outside-wall access and any odour or smoke concerns. The appropriate professional must confirm the design and approval requirements.

Reference: Air-Flow Systems ENVIRO brochure, ACS-DOC-100094 Rev. A, pp. 2-5.

UV filtration

EMEX UV treatment, system requirements and maintenance.

UV technology in the wider system

The EMEX product literature describes UV treatment alongside mechanical grease separation in commercial kitchen extraction. Suitability depends on the complete system.

What the reference describes

Grease filters provide the first separation stage. UV treatment acts on part of the remaining cooking effluent within the extraction system.

Integration comes first

Review the cooking process, airflow, canopy configuration, duct route, discharge and any additional filtration needs together. A UV component should not be selected independently of the ventilation design.

Installation and servicing

The technology involves UV and ozone. Selection, controls, access and servicing require a competent specialist and current manufacturer instructions.

Bring the right project information

List cooking equipment and fuel types, describe smoke or odour concerns, and provide available drawings and photographs. For an existing installation, identify the model and its current service documentation where available.

Reference: EMEX UV Technology Hoods, Ventpro, pp. 2-4.

Kitchen fire suppression

ANSUL R-102 equipment and project coordination.

Plan fire protection with the cooking line

The supplied ANSUL R-102 overview describes a restaurant fire-suppression system for cooking appliances and associated extraction equipment. The actual hazards drive the design.

Protection is appliance-specific

The reference covers cooking appliances together with associated hoods, ducts and plenums. The system design must be checked against the equipment, layout and current manufacturer requirements by the appropriate qualified specialist.

Two configurations in the reference

The R-102 overview describes appliance-specific nozzle arrangements and overlapping protection arrangements. These are design options to assess, not permission to move or replace appliances without a specialist review.

Coordinate early

Share the equipment schedule, fuel types, canopy and duct drawings, and the intended kitchen layout. Confirm the specialist design, installation, commissioning and ongoing service responsibilities within the project scope.

For an existing system

Provide the system identification, available commissioning and service records, and details of any equipment or layout changes. Ask the responsible specialist to assess whether the installed protection remains appropriate.

Reference: ANSUL R-102 Product Overview, Johnson Controls, 2018, Form F-2013152-06.

Ventilation systems

VENTPRO system families and how the components fit the application.

One kitchen, a coordinated system

The VENTPRO reference range brings together canopy arrangements, replacement air, filtration and supporting components for commercial kitchen ventilation.

Match the canopy to the duty

Wall and island extraction canopies serve different layouts. Display canopies address serving areas; condensate canopies address steam where grease is not the main requirement. The chosen application determines the specification.

Account for replacement air

Supply-and-extract arrangements incorporate make-up air into the canopy concept. The wider building air balance, cooking load and comfort requirements need to be considered with the extraction design.

Select treatment for the problem

The reference includes UV options and ecology units using particle collection and carbon treatment. Smoke, grease and odour are different concerns; treatment stages and discharge arrangements should be assessed for the site.

Coordinate the supporting components

Filters, lighting, controls, ducting, fans, attenuation and fire-protection provisions form part of the wider project discussion. Confirm the selected components, access arrangements and specialist responsibilities in the agreed scope.

Reference: VENTPRO Brochure 2, pp. 2-8.

Before you make contact

Common project questions.

Answers to quotation, service and design questions.

Start project enquiry
01What should I send for an initial quotation?

Start with the project location, cooking-equipment list, fuel type, kitchen plan, possible duct route and any known smoke, odour or approval constraints. Photos and drawings can follow after direct contact.

02Can you look at an existing extraction problem?

Yes. Explain the symptoms and share what is known about the canopy, ducting, fan, make-up air and discharge point. The complete air path needs to be considered, not only one component.

03When should filtration be considered?

Additional treatment may be relevant where grease, smoke, odour or a constrained discharge creates a project requirement. The suitable approach depends on the cooking duty and site conditions.

04Do you provide drawings for approvals?

Consultancy and mechanical drawing support can form part of the project. Where engineering approval is required, it must be provided by an appropriately approved engineer.

05Which areas do you serve?

Air-Flow Systems focuses on Cape Town and the Western Cape. Confirm the project location when making contact so the practical scope can be discussed.

06Do I need a kitchen canopy or a complete extraction system?

The canopy or hood captures cooking effluent, but it must work with grease separation, ducting, an extractor fan, replacement air and a suitable discharge point. Share the cooking-equipment list and kitchen layout so these parts can be considered together.

07What is make-up air in a restaurant kitchen?

Make-up air is replacement air for the air extracted from the kitchen. The supply and extraction arrangements need to be considered with the wider building, cooking load and comfort requirements.

08Can a kitchen use ductless or recirculating extraction?

This depends on the equipment and cooking duty. The supplied ENVIRO literature limits recirculation to light cooking without gas-fired equipment. Low-level external discharge is a separate configuration. Discuss the fuel types, fresh-air provision and site constraints before selecting either option.

09Can you help with steam extraction above a dishwasher?

The supplied canopy range includes steam and dishwasher applications. A condensate canopy addresses a different duty from grease extraction over a cooking line. Include the equipment type, position and room layout in your enquiry.

10How much does commercial kitchen extraction cost?

A useful quotation needs the cooking line, canopy arrangement, duct length and route, fan, replacement air, filtration, access and drawing requirements. Air-Flow Systems confirms the project scope before quoting; there is no single price that suits every kitchen.

11Should a kitchen layout change include a ventilation review?

Share changes to appliances, fuel types, canopy position or the duct route before work proceeds. Existing extraction and specialist fire protection need to be considered against the revised equipment and layout.

Project enquiries

Tell us what you are planning.

Project enquiry

Start your project enquiry

No finished specification needed. Share what you know, select all relevant services and choose how you would like us to reply. We can arrange follow-up details after receiving your enquiry.

Preferred reply method (required)

Provide an email address for your reply.

Services needed select all that apply (required)

Choose a reply method and provide the matching contact detail. Protected by spam screening. Please share only the information needed to discuss your project.

You may be asked to complete a spam check after sending. If the form cannot be completed, call David during business hours.

Call David
082 521 6167Monday-Friday, 08:00-16:00 (SAST)

Privacy notice.

Air-Flow Systems uses the details you provide to respond to your enquiry or privacy request.

Information handling and your choices

We ask for your name, organisation, contact details and project information. The optional enquiry-source field helps us understand which channels bring enquiries; you can change it or leave it blank. Share only what is needed, without confidential documents or sensitive personal information.

FormSubmit processes the form for email delivery. Its documentation states that submissions remain in its archive for 30 days. Email copies received by Air-Flow Systems are handled separately.

To request access, correction or deletion, use the enquiry form and choose “Privacy request”.

Google Analytics is optional and loads only after you allow it. It measures visits and enquiry activity without receiving your form answers. Advertising features are disabled. Analytics cookies expire after 90 days; use Analytics preferences to decline or withdraw your choice.

Project briefStart project enquiry